Resource Type

Journal Article 641

Year

2023 25

2022 47

2021 33

2020 40

2019 29

2018 44

2017 35

2016 43

2015 22

2014 22

2013 31

2012 23

2011 50

2010 38

2009 20

2008 33

2007 19

2006 10

2005 12

2004 13

open ︾

Keywords

Three Gorges Project 33

project management 23

Three Gorges Project ship lift 9

three-dimensional 9

ship lift 8

Software-defined networking (SDN) 6

concrete 5

construction project 5

construction management 4

design 4

different 4

management 4

sustainable development 4

China 3

calculation 3

construction 3

meta-synthesis management 3

risk management 3

simulation 3

open ︾

Search scope:

排序: Display mode:

Construction summary of Three Gorges Project ship lift

Zhao Xijin

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 9-14

Abstract:

The ship lift of Three Gorges Project is huge and technically complexThe design and research process of Three Gorges Project ship lift , has been strongly supported by manyAfter scheme comparison, the Three Gorges Project ship lift eventually identified as rack and pinionGorges Project organized by the Three Gorges Project Corporation.Gorges Project ship lift.

Keywords: construction     review     ship lift     Three Gorges Project    

Support system load test of beam Bailey truss of Three Gorges Project ship lift

Wang Wenliang,Xiao Chuanyong,Zhang Junxia

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 50-54

Abstract:

During the continued construction of Three Gorges Project ship lift,

Keywords: beam     Bailey truss     experiment     Three Gorges Project ship lift    

Temperature control and crack prevention technology for concrete on ship lift tower of Three Gorges Project

Yang Fuying,Feng Xiaolin,Li Xiaoping

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 55-58

Abstract:

The structure of ship lift tower in Three Gorges Project, belonging toTemperature control and crack prevention technology for concrete in ship lift tower of Three Gorges Projecthas important reference value to research the technical level of temperature control measures for shiplift projects at home and abroad, to improve the quality of concrete construction in hydropower projects

Keywords: ship lift tower     concrete     temperature control     crack prevention     Three Gorges Project ship lift    

Control measures of installation precision of Three Gorges Project ship lift rack and nut column

Wei Yan,Peng Hanlin,Lin Fan

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 91-96

Abstract: According to technology requirements of installation precision and characteristics of rack, nut column of ThreeGorges Project ship lift, and combined with the integrated environment the installation method and installationput forward the suitable rack, nut column installation construction process and control measures for ThreeGorges Project ship lift.

Keywords: Three Gorges Project ship lift     rack     nut column     installation of control     precision control    

Clearance grouting process test of Three Gorges Project ship lift rack and nut column

Zhan Jianxia and Li Jihu

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 45-49

Abstract: grouting process, and simulate the actual situation of clearance grouting of rack and nut column in shiplift, grouting process test and prototype grouting experiment were carried out respectively.Comparing three kinds of domestic grouting material and the German PAGEL grouting material in groutingmaterial and grouting process were selected which were suitable for the rack and nut column joint in ThreeGorges Project ship lift.

Keywords: rack     nut column     grouting     ship lift     Three Gorges Project    

Safety monitoring and analysis on crossbeam supporting system of Three Gorges Project ship lift

Liu Xinqing,He Wei

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 108-112

Abstract:

Safety monitoring on crossbeam supporting system of Three Gorges Projectship lift has been introduced in detail through the selection of monitoring objects, determination of

Keywords: Three Gorges Project ship lift     safety monitoring     crossbeam supporting system     Bailey rack    

Design and construction of steel roof truss on top of Three Gorges Project ship lift machine room

Sun Changzhong

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 33-39

Abstract:

According to the use of the steel roof truss on top of the Three GorgesProject ship lift machine room, steel roof truss structure is analyzed.scheme, construction procedure and construction equipment selection are formulated which is suitable for ThreeGorges Project ship lift steel roof construction work at the top of the room environment.The structure design method and construction scheme of the steel roof of Three Gorges Project ship lift

Keywords: ship lift     computer room     steel roof truss     design     construction     Three Gorges Project    

Deformation monitoring on Three Gorges Project ship lift tower during construction period

Qiu Zhangyun,Luo Chen

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 102-107

Abstract: choice is that total station polar coordinate would be used as the deformation monitoring method of ThreeGorges Project ship lift tower during construction period, and deformation analysis is received using

Keywords: Three Gorges Project ship lift     tower column     deformation monitoring     total station polar coordinate    

Construction technology of Three Gorges Project ship lift hydraulic self-climbing formwork

Dai Zhiqing

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 22-26

Abstract:

The construction time limits for the tower column concrete of Three GorgesProject ship lift is pressed for time and require high accuracy.Gorges Project ship lift tower column concrete.Gorges ship lift, effectively improve the construction efficiency, save cost, ensure the engineeringquality and improve the safety of the construction,can provide reference for other hydropower project

Keywords: tower concrete     hydraulic self-climbing formwork     concrete pouring     Three Gorges Project ship lift    

Construction procedure study of ship chamber of Three Gorges Project ship lift

Zeng Ming

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 40-44

Abstract: Reasonable ship lift ship compartments chamber construction procedure and construction schedule arrangementlift commissioning.Engineering practice proved that chamber construction procedures of Three Gorges Project lift ship establishedThree Gorges Project lift ship and guarantee the safe operation of ship lift. these construction procedurescan provide a reference for similiar project.

Keywords: construction procedure     ship chamber     ship lift     Three Gorges Project    

Construction technology of tower column of Three Gorges Project ship lift

Zhou Jianhua

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 15-21

Abstract:

This paper firstly describes the whole construction program of the tower column. Then the important and difficult construction problems have been analyzed, such as the precision control of civil structure, the precision control of metal structures and its embedded parts, concrete temperature control and crack prevention, and safety control. At the same time, the construction surveying control technique, the temperature control and crack prevention technique of thin wall concrete, high precision concrete continuous and rapid construction technique,metal structure construction technique,and the construction technique of high altitude and large span beam structure have been made a systemic summary. The application of those construction techniques meets the requirement of high precision construction of the tower column and ensures its smooth construction. Meanwhile, these construction techniques lay a solid foundation for the construction of similar projects.

Keywords: ship lift     tower column     construction techniques     Three Gorges Project    

Theoretical and experimental study on seismic response control on top of Three-Gorges ship lift towers

Weilian QU, Jianwei TU

Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 1,   Pages 32-41 doi: 10.1007/s11709-009-0003-8

Abstract: A vertical ship lift under earthquake excitation may suffer from a whipping effect due to the suddenchange of building lateral stiffness at the top of the ship lift towers.Theoretically, the dynamic models of MR damper and the mechanical model of ship lift was established,network controlling algorithm was proposed and the fundamental semi-active control equation for the Three-Gorgesship lift where the MR intelligent isolation system was installed was deduced.

Keywords: Three-Gorges ship lift tower     whipping effect     magnetorheological (MR) intelligent isolation system     neural    

Research on concreting equipment planning of ship lift boat cab segment in Three Gorges Project

Huang Jiaquan,Ma Shaofu,Yu Yongjun

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 59-63

Abstract: text-align: justify;">This paper describes the selection process on concrete construction equipment of shiplift boat cab segment in Three Gorges Project in detail, including analysis on the characteristics ofGorges Project ship lift boat cab section effectively covers all pouring surface, meeting the warehousingThe concreting equipments of Three Gorges Project ship lift boat cab segment have been pre-rational plannedGorges ship lift project, and they have high promotion and application value.

Keywords: construction equipment     equipment layout     concrete pouring     boat cab     Three Gorges Project ship lift    

High precision installation technology of metal structure embedded parts of Three Gorges Project shiplift

Wei Shuman,Zhang Weiming and Li Chenzhi

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 87-90

Abstract: At the same time, various construction plans which are suitable for Three Gorges Project ship lift areThese construction plans which have been successfully used in Three Gorges Project have solved many technological

Keywords: ship lift     metal structure embedded parts     high precision     installation technology     Three Gorges Project    

Concrete construction technology on tower beam of Three Gorges Project ship lift

Yu Ying

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 27-32

Abstract: text-align: justify;">he concrete construction of the beam concrete of tower load-bearing structure in ThreeGorges Project ship lift is difficult, with high-complexity and no mature technology available for referenceGorges Project ship lift, the concrete construction technology for continued construction of the ThreeGorges Project ship lift top beam is summarized, which uses hierarchical, block pouring approaches.The concrete construction practices of Three Gorges Project ship lift tower beam certify the effectiveness

Keywords: ship lift     beam     concrete     construction joints     pouring stratification     Three Gorges Project    

Title Author Date Type Operation

Construction summary of Three Gorges Project ship lift

Zhao Xijin

Journal Article

Support system load test of beam Bailey truss of Three Gorges Project ship lift

Wang Wenliang,Xiao Chuanyong,Zhang Junxia

Journal Article

Temperature control and crack prevention technology for concrete on ship lift tower of Three Gorges Project

Yang Fuying,Feng Xiaolin,Li Xiaoping

Journal Article

Control measures of installation precision of Three Gorges Project ship lift rack and nut column

Wei Yan,Peng Hanlin,Lin Fan

Journal Article

Clearance grouting process test of Three Gorges Project ship lift rack and nut column

Zhan Jianxia and Li Jihu

Journal Article

Safety monitoring and analysis on crossbeam supporting system of Three Gorges Project ship lift

Liu Xinqing,He Wei

Journal Article

Design and construction of steel roof truss on top of Three Gorges Project ship lift machine room

Sun Changzhong

Journal Article

Deformation monitoring on Three Gorges Project ship lift tower during construction period

Qiu Zhangyun,Luo Chen

Journal Article

Construction technology of Three Gorges Project ship lift hydraulic self-climbing formwork

Dai Zhiqing

Journal Article

Construction procedure study of ship chamber of Three Gorges Project ship lift

Zeng Ming

Journal Article

Construction technology of tower column of Three Gorges Project ship lift

Zhou Jianhua

Journal Article

Theoretical and experimental study on seismic response control on top of Three-Gorges ship lift towers

Weilian QU, Jianwei TU

Journal Article

Research on concreting equipment planning of ship lift boat cab segment in Three Gorges Project

Huang Jiaquan,Ma Shaofu,Yu Yongjun

Journal Article

High precision installation technology of metal structure embedded parts of Three Gorges Project shiplift

Wei Shuman,Zhang Weiming and Li Chenzhi

Journal Article

Concrete construction technology on tower beam of Three Gorges Project ship lift

Yu Ying

Journal Article